Alan Levine

Managing Director, OPEN MIND Technologies USA Inc.

The Weakest Link

Any process is most likely to fail at its weakest link. Ask any manufacturing engineer about their post-processor experiences, or look in the mirror. The post-processor is often the weakest link.